Estimate the amount of excavation required in the construction of the tank..
A.For a proposed new road, the cross-sectional areas at different sections are as
follows:
Calculate the volume enclosed between chainage 1000 m and 1120 m by the
prismoidal and end area formulae.
B. A vertical sided rectangular tank ABCD is to be constructed such that sides AB and
AD have lengths 60 m and 30 m, respective ly. The formation level is to change
uniformly from 82 m above datum along AD to 80 m above datum along BC.
Readings were taken with a level in the following order:
Estimate the amount of excavation required in the construction of the tank.
The post Estimate the amount of excavation required in the construction of the tank. appeared first on Best Custom Essay Writing Services | EssayBureau.com.
Estimate the amount of excavation required in the construction of the tank.