A.For a proposed new road, the cross-sectional areas at different sections are as

 

follows:

Calculate the volume enclosed between chainage 1000 m and 1120 m by the

prismoidal and end area formulae.

B. A vertical sided rectangular tank ABCD is to be constructed such that sides AB and

AD have lengths 60 m and 30 m, respective ly. The formation level is to change

uniformly from 82 m above datum along AD to 80 m above datum along BC.

Readings were taken with a level in the following order:

Estimate the amount of excavation required in the construction of the tank.